Adaptation and installation in the service areas of compressed air, water, syrup, CIP, CO2, natural gas and electric installation to cover demand that each one require in the line 5 in the plant Installation requires non-returnable packaging of last generation to produce 1000 bpm Electro worked with AC to provide the services this line requires
  • Results
  • -Use of existing assets
  • -Growth of electric substation
  • -Installation of water lines, compressed water, syrup, CIP, CO2 and natural gas up to the line #5
  • -Mechanical work and electric with high quality standards and innocuousness