Coca Cola San Agustín modernize the main electrical substation within the plant
Solution proposal
Electro participate together with the Coca-Cola expert engineering team and the plant of the design, installation and service setting of a new electric substation No. 1 to give the most reliability to the electric service to the bottling machine.
Electrical substation
Modernization project of a plant of a plant because of the needs of growth demand according to the highest and most strict manufacturing standards of quality and security.
Results
The challenge consist of to create this modernization with the minimum affectation in the production continuity of the bottling machine
-Use of existing assets
-New dry transformer
-New low tension board
All in all a new electric substation more reliable and robust that maximize the profitability in the plant