- Origins
- Coca Cola San Agustín modernize the main electrical substation within the plant
- Solution proposal
- Electro participate together with the Coca-Cola expert engineering team and the plant of the design, installation and service setting of a new
- electric substation No. 1 to give the most reliability to the electric service to the bottling machine.
- Electrical substation
- Modernization project of a plant of a plant because of the needs of growth demand according to the highest and most strict manufacturing standards of quality and security.
- Results
- The challenge consist of to create this modernization with the minimum affectation in the production continuity of the bottling machine
- -Use of existing assets
- -New dry transformer
- -New low tension board
- All in all a new electric substation more reliable and robust that maximize the profitability in the plant