Coca-Cola Chihuahua grows and improve his production capacity to fill market demand
Origins
Arca installed a new non-returnable packing line within the plant RIMAC in Lima, Perú. Electro helped with AC to move the line to Lima to install it in Chihuahua.
Solution proposal
Electro participated with the expert engineering team of Arca Continental in the next periods of the project:
-Transfer to Lima, Peru
-Unloading and armed of Chihuahua
-Support with the car manufacturers for their maintenance
-Installation of services (water, air, syrup, CO2, etc)
Results
It was achieved the consolidate the production capacity of the plant in Chihuahua, by means of