Grupo Piasa Tres Valles Refinery OriginsDesign and installation of a brand new line.Solution proposalAdaptation and installation in the service areas of air compressed, water, syrup, CIP, CO2 and electric installation.Results - Use of existing assets- Growth of electric substation- Installation of water lines, compressed air, syrups, CIP, CO2 and natural gas Share: