Plant at Aguascalientes grew his production capacity
Adaptation and installation in the service areas of compressed air, water, syrup, CIP, CO2, natural gas and electric installation to cover demand that each one require in the line 5 in the plant
Installation requires non-returnable packaging of last generation to produce 1000 bpm Electro worked with AC to provide the services this line requires
Results
-Use of existing assets
-Growth of electric substation
-Installation of water lines, compressed water, syrup, CIP, CO2 and natural gas up to the line #5
-Mechanical work and electric with high quality standards and innocuousness