Casos de Éxito

electroCasos de Éxito Success StoriesSan Luis Bottling Production Line 2

San Luis Bottling Production Line 2

  • Origins
  • Obsolete equipment line 2 in the electric system and transport control
  • Solution proposal
  • Development of a project to modernize the electric and control system
  • Results
  • -Reduction up to 95% in system failure
  • -Project execution with no productivity interruption.
  • -Increase productivity in the processes
  • -Reduction of workload
  • -More effective after-sales service
 

© 2018 ELECTROCONSTRUCTORA DEL GOLFO S.A. DE C.V. | ALL RIGHTS RESERVED